Royal Sovereign RSL- 2702S Owner's Manual Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
5
6. THREADING FILM
1. Turn the power switch on("I" position). Power switch
is located in the rear of the unit on the left side.
2. Complete the "Loading Film" steps as shown on
page 4.
3. Set the temperature and speed according to the
Recommended Temperature and Speed section.
4. Remove the Front Table.
5. Pull down the upper film over the Safety Cover to
the lower film; align and center the lower film to
upper film (Picture 1).
6. Rewind the upper film until the film aligns with the
Safety Cover.
7. Thread the film over the Upper Idle Bar and
underneath the Safety Cover until the film rests on
the upper roller (Picture 2).
UPPER ROLL FILM
ADHESIVE SIDE
UPPER IDLE BAR
ROLL
ADHESIVE SIDE
LOWER ROLL FILM
FIRST IDLE BAR
SECOND IDLE BAR
GLOSSY SIDE
GLOSSY SIDE
Picture 2
Picture 1
6.1. HOT FILM
Page view 5
1 2 3 4 5 6 7 8 9 10 11 ... 19 20

Comments to this Manuals

No comments